Management Team Meeting

Engineers’ House Bristol, 11th September 2012

 

Agenda can be downloaded here.

Minutes of meeting can be downloaded here.

 

Presentation Author
Work Package Report: 1.2 Vladimir Terzija
Work Package Report: 1.3 Phil Mawby
Work Package Report: 1.3 Steve Swingler
Work Package Report: 2.1 N. Jenkins, J. Wu
Work Package Report: 2.2 Mark Johnson
November 2012 Meeting Vladimir Terzija